Featured Projects


PROJECT : Mill Wide Air Project

 

“I’ve never been part of a smoother non-outage transition from an existing mill-critical system to a new one, especially one in the range of $10+ million. People around the mill were asking about the system install days after it had been completed – it was so quiet they hadn’t even noticed a transition!”


CLIENT: Georgia Pacific

LOCATION: Brewton, AL

DESCRIPTION: Install new MCC and Drive Room to feed all associated equipment. Make all terminations including controls, instrumentation and medium voltage.


PROJECT: Morgan Memorial Hospital
 

“MetroPower is a great asset to any project team. They bring experience, dedication and we have a goal-oriented relationship which goes a long way in the markets we currently serve.”
— Jep Pound, Project Manager 


CLIENT: Brasfield & GorrieLOCATION: Madison, Georgia

DESCRIPTION: A 73,000 square foot, 25 bed replacement hospital and medical office building for Morgan County including a state of the art emergency department and imaging services.


PROJECT: Marine Corp Logistics Base, Building 3700, Ground Source Heat Pumps
 

“MetroPower’s ability to accomplish the project goals on schedule while also maintaining very high safety standards makes them a subcontractor we have
chosen to help us grow our business.”
— Jason Norris,  Project Manager Artesian Contracting Co. 

 

CLIENT:  Artesian Contracting Company

LOCATION: Marine Corps Logistics Base, Albany Ga.

DESCRIPTION: Install new 3000 amp service for five new eighty ton chillers, four 1,200 gpm pumps and other associated HVAC equipment.


PROJECT:  Camp Southern Ground Dining Hall
 

“MetroPower’s commitment to safety, skill and expertise are unmatched.  They’ve been extremely flexible in accommodating changes and are a positive team to work with.”
— Scott Young, DPR Construction.


CLIENT:  Owner: Camp Southern Ground
General Contractor: DPR Construction/Structor GroupLOCATION : Fayetteville, Georgia

DESCRIPTION: New “ground up” construction of a 19,755 square foot high-end dining hall facility on the Camp Southern Ground Campus.  This project includes (1) 600A and (1) 1200A secondary services, distribution gear and feeders, branch power, mechanical systems power, kitchen equipment feeders, custom light fixture package (including 880’ of led linear tape lighting), custom Lutron dimming and lighting control system fully integrated into the building automation system. , 125kW emergency backup generator with (2) 200A automatic transfer switches, fire alarm system and raceway for all other owner provided low voltage systems.