Completed 2007
Summit Hospital - New Construction - Phenix City, AL
Installed electrical for a new four-story hospital including fire alarm system and an 800 KW standby generator.
Oral Surgery Center - New Construction - Easley, SC
Installed the complete electrical system for a new oral surgery center. Provided all electrical distribution, lighting, fire alarm, UPS, and generator backup. Provided conduit for supplemental systems and made final connections to owner furnished dental chairs and equipment.
Hart Co. ER/OR Addition - Hartwell, GA
Installed electrical power, lighting and systems for 13,500 sq. ft. addition to ER/OR. This included a new 400KW generator, transfer switches, and emergency distribution system. Also installed an additional 800 amp service with distribution panels.
HCA Palmyra Hospital - Energy Audit - Albany, GA
Disconnected 7 supply and return fans from existing magnetic motor starters and reconnected to VFDs in order to improve energy efficiency.
Fort Atkinson Medical Center - Ft. Atkinson, WI
Installed a 1200 amp 208/120v 3-phase service complete with lighting fixtures, lighting control, HVAC, x- ray, site lighting, sprinkler monitoring, and tele/data raceways in a 19,000 sq. ft. medical clinic.
Completed 2006
Palmyra Hospital -CT Scan and Renovation of Vascular Lab and Special Procedures Area - Albany, GA
Installed new lighting, power, GE Medical Equipment, fire alarm, nurse call stub-ups, normal and emergency riser modification.
|