Completed 2007
Oakland Meadow High School - Voice/Data Project - Lawrenceville, GA
Installed GCPS Voice/Data in Oakland High School
Department of Homeland Security - Renovation Building 681 - Brunswick, GA
Installed 796 Cat. 6 data cables and 518 Cat. 6 voice cables with 5 Cat. 5E riser cables. Terminated and tested all connections.
Department of Defense - 75th Battalion Headquarters - Savannah, GA
Installed 796 Cat. 6 data cables and 518 Cat. 6 voice cables with 5 Cat. 5E riser cables. Terminated and tested all connections.
Radium Springs Middle Schol - Telecom - Albany, GA
Installed a structured cabling system in new school. The site consists of 5 main building areas (office, 3 story classrooms, admin area, cafe and gym). The cabling system includes voice/data outlets, intercom cables, video cables and copper/fiber optic backbones.
GA DOT - Speed Detection System - Cusseta, GA
Installed 2 speed detection systems including 7,160 lf of trenching and conduit, seven 45 foot poles, 2 cameras and 2 radar systems in a speed sign.
City of Albany - Albany Traffic Fiber - Albany, GA
Installed one 144 ft. strand sm fiber from Pine Ave. and Jackson St. through 15 manholes, one 24 strand sm fiber from Gillionville Rd. and Slappey Blvd. to Gordon Ave and Slappey Blvd and one 48 strand sm from Gillionville Rd. and Slappey Blvd. to the bypass and Slappey Blvd. Installed thirteen total 6 strand pre-terminated cabinets at thirteen traffic signal bores and spliced the pig-tails into fiber trunk.
City of Albany - Traffic Signal Upgrade - Albany, GA
This project consisted of the demolition and new installation of 13 traffic intersections, 29,442 linear feet of directional bore, handicap access ramps at each intersection, new traffic striping at each intersection and new fiber from the traffic command center to each intersection.
Department of Defense - CACTF Fiber - Ft. Benning, GA
Installed 49,000 feet of fiber optic backbone cable, fusion spliced 2,016 strands of fiber optic cable, and terminated 1,248 strands of fiber optic cable.
Darton College - Academic Services Building - Albany, GA
Installed a structured cabling system in the Academics Services Building. This included 4 data closets and 250 dual cat-6 drops. Also installed 200 feet of a 4" EMT between two equipment rooms in Building A.
Department of Corrections - Autry State Prison - Morgan, GA
Installed a structured cabling system in the Autry State Prison. The cabling spanned 12 buildings, 14 data closets and 488 dual cat-6 drops using existing conduit, and forty-one 1" EMT drops.
Department of Corrections - Wilcox State Prison - Abbeville, GA
Installeded 155 Cat-6 V/D cables, racking, patch panels in one MER and 15 satellite TR's. Moved existing fiber from wall to new rack in the MER. Installed 1' EMT conduit for 15 locations. Crossed over voice and data circuits at end of project.
Cobb County - Cobb Energy Perfomance Arts Center - Atlanta, GA
Installed all HVAC controls for a Siemens Building Automation project.
|