| MEDICAL
PROJECTS |
|
 |

Summit
Hospital
New Construction
Phenix City, AL
Installed electrical for a new four-story
hospital including fire alarm system and an 800
KW standby generator.
|

2006
- Eisenhower Medical Center
Ft. Gordon,
GA
Built an outside electrical distribution center
to replace all the existing main switch gear in
the hospital. Setup new emergency generators
and transfer switches for the hospital.
|
2008 – Medical
Tower of Central Georgia
Heart Center
Macon, GA
Part of a Design/Build Team for the Heart Center Project. It consists of
an 8 story cardiac and vascular care center equipped with pre/post holding patient
rooms, 10 cath labs, pharmacy, administration, 2 -1250kw emergency generators,
7 story parking deck with connector bridge to main building.
|
2009
- Phoebe Putney Memorial Hospital
Albany, GA
Includes 169,000 square feet medical building with 59,000 square feet of Oncology
treatment and 110,000 square feet of future tenant space.
|
Hart
Co. ER/OR Addition
Hartwell, GA
Installed electrical power, lighting
and systems for 13,500 sq. ft. addition to ER/OR.
This included a new 400KW generator, transfer
switches, and emergency distribution system.
Also installed an additional 800 amp service
with distribution panels.
|
HCA
Palmyra Hospital
Energy Audit
Albany, GA
Disconnected 7 supply and return fans from existing magnetic motor starters
and reconnected to VFDs in order to improve energy efficiency.
|
Fort
Atkinson Medical Center
Ft. Atkinson, WI
Installed a 1200 amp 208/120v 3-phase service
complete with lighting fixtures, lighting control,
HVAC, x- ray, site lighting, sprinkler monitoring,
and tele/data raceways in a 19,000 sq. ft. medical
clinic.
|
Oral
Surgery Center
New Construction
Easley,
SC
Installed the complete electrical
system for a new oral surgery center. Provided
all electrical distribution, lighting, fire
alarm, UPS, and generator backup. Provided
conduit for supplemental systems and made final
connections to owner furnished dental chairs
and equipment.
|
|
|
| |
|