| Our
Clients Say It Best
|
Given the complexity and
the various
obstacles we
ran into during construction
on this data center,
MetroPower’s
performance
was fantastic.
Frank Mignella,
Construction Project Manager
BRUNS-PAK |
| |
|
|
| MEDIUM
VOLTAGE PROJECTS |
|
 |

2009
- Fowler Wind Farm
Earl Park, IN
Underground electrical for the Collector System. Installing ground splices
and ground sleeves for wind farm tower circuits.
|

2008
- Indiana Wind Farm
Earl Park, IN
Terminate
the collector system for Benton County Wind Farm
consisting of 6 circuits with 87-1.5 megawatt wind
turbine generators to include; 633 MV primary,
and 3,132 secondary terminations on 87- 1750KVa
34,500V- 575V transformers and wind turbine controllers
and J-boxes, 142- medium voltage splices, 276-
ground sleeves, VLF Hi-Pot testing of the circuits.
|
2007
- West Central Regional Hospital
Columbus, GA
Replaced pad mount switchgear and thirteen
primary live front transformers. Excavated transformer
locations and pulled existing primary cable to new
transformers. Re-terminated secondary feeders to
fit appropriate footages.
|
2007
- FAMU
Campus-Wide Electrical
Upgrade
Tallahassee, FL
Installed 10,055 lf of new underground duct bank, sixteen new precast manholes,
transformers, pad-mounted switchgear and new main switchgear. Modified the electrical
service in several existing buildings and installed a campus power monitoring
system.
|
2009
- Ga Tech / Sub Phase I
Atlanta, GA
Design
build project that includes the construction and
commissioning of the campus electrical distribution
system. The work includes upgrading/installing
dew ductbanks, manholes, primary cable, low voltage
switchgear, and secondary feeders.
|
2009
- Tallahassee FCI Utility
Tallahassee, FL
Power house and utilities infrastructure internal
and external at Federal Correctional Institution. Utility systems include storm and sanitary sewer, domestic
water, gas, power, communication and chilled water distribution. Also
includes the utility installation beneath the secured
perimeter fence line.
|
2009
- FAMU Electrical Upgrade Phase II
Tallahassee, FL
Rebuild a major portion of the campus wide primary
electrical distribution system at Florida A&M University, which incorporate a fiber optic power metering
system. This project consisted of MetroPower converting the existing 5KV System
to 15KV System though overhead and underground
primary distribution. MetroPower installed 18,000
linear feet of primary ductbank, 28 electrical manholes,
38 Primary Transformers, and 5 Primary Switches in
order to accomplish the scope of the project.
|
GA
DHR
West Central Regional
Hospital
Columbus, GA
Replaced a pad mount switchgear and thirteen primary live front transformers.
Excavated transformer locations and pulled existing primary cable to new transformers.
Re-terminated secondary feeders to fit appropriate footages.
|
|
|
| |
|